1/10/2024 0 Comments Landis and gyr user guideI was also demanding British Gas install the latest ‘Phase 3’ smart meters which, as I understand it, are still really in teething stage, so, although frustrating at the time, I do have to forgive them the delays.īut over time I hope that more features and benefits may be unveiled. To be fair to British Gas I think their initial reluctance to install Smart Meters was partly caused by a temporary stall to the UK Smart Meter roll-out programme imposed partly by the Government changing their mind on the specifications for Smart Meters (or possibly British Gas, in an effort to be ahead of the game, had started rolling out Smart Meters too early before the specifications had been fully finalised by UK Government?). This was followed by another wait between the Electricity and Gas meters due to a problem following the install of the Electricity Meter, there was an “issue with communication with the Head End”, which meant the engineer was forced to abort progressing with the install of the Gas Meter and the remainder of the work had to be rescheduled to a later date 4 months later! Leaving me for a while with one Smart (Electricity) Meter and one Dumb (Gas) Meter, (this was not an issue for the supply of either utility but it just grated against my OCD / geeky / impatient nature).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |